top of page

GYMNASIUM

Demolition of the existing wood joist-based gymnasium and installation of piles and a structural slab with a high level of flatness 

The project was completed with MUA, ventilation, and a proper sports hardwood floor with game lines

© 2021 Boald Construction Management Ltd. All Rights Reserved.

  • Instagram
  • Facebook
bottom of page